print this page
AAA

Tube, Pipe & Fittings

Loading

Press-connect Joints:
Installation Steps

  • Measure tubing accurately to insure it sockets completely to the base of the fitting cup.
    Figure 50. Measuring
  • Cut the tubing square, perpendicular to the run of tube, using an appropriate tube cutter.
    Figure 51. Cutting the tube square
    Figure 52. Tube cutters
     
  • Burrs must be removed from the I.D. and O.D. of the cut tube end.
    Figure 53. Reaming tools
    Figure 54. Chamfer tool for O.D. burr removal
     
  • Chamfer the cut tube end to reduce the possibility of gasket damage when inserting the tube into the fitting.
    Figure 55. Properly prepare tube end
  • Examine the fitting to be used to ensure the sealing gasket is properly positioned and is not damaged.
    Figure 56. Press fitting
    (NOTE: Missing gasket)
  • Depth of insertion must be marked on the tube prior to inserting the tube into the fitting.
    Figure 57. Measuring depth of insertion
  • Select the proper size of the appropriate pressing jaw and insert it into the pressing tool.
    Figure 58. Pressing jaw selections
  • Ensure the tube is completely inserted to the fitting stop (appropriate depth) and squared with the fitting prior to applying the pressing jaws onto the fitting.
    Figure 59. Fitting prepared for pressing
  • Place the pressing jaw over the bead on the fitting and ensure the tool and jaws are at a 90° angle (perpendicular) to the centerline of the tube.
  • Depress the pressing tool trigger to begin the pressing cycle.
    Figure 60. Properly positioned press tool
  • When the pressing cycle is complete, release the pressing jaw and visually inspect the joint to ensure the tube has remained fully inserted, as evidenced by the visible insertion mark.
    Figure 61. Completed installation of a press-connect joint

Copper Tube Handbook

Available in 3 formats:

Web Version
and
PDF Version
and
Desktop Application